The short answer
Lumding-Badarpur hill railway: what visitors should know first
Yes if you enjoy train travel and have flexible time. Book ahead, expect delays in the monsoon, and ride in daylight. Check current timetables and running status, since services on this single-line hill section have been disrupted by landslides.
History and context
The story behind Lumding-Badarpur hill railway
One account says the British completed the Lumding-Badarpur hill line in December 1903 through a series of tunnels and bridges, after about 11 years of work. The line was originally metre gauge, with the Hill Queen Express running between Lumding and Haflong, until conversion to broad gauge.
In 2022, heavy rain flooded New Haflong station and derailed a parked train. In June 2026, NFR reported energising a 132 kV line to the New Haflong traction sub-station, with electric operation expected after testing.
Useful facts
Lumding-Badarpur hill railway facts at a glance
- Location
- New Haflong station (NHLG), Dima Hasao
- Experience type
- Scenic hill railway journey
- Known for
- Tunnels, bridges and ridges on the Lumding-Badarpur section
- Built
- British period; one account says completed 1903
- Time or schedule
- Check current timetable and running status
Why it matters
Why Lumding-Badarpur hill railway is worth your time
Haflong exists as a station on a remarkable piece of railway. The Lumding-Badarpur line was built by the British through some of the most difficult country in the northeast, and one account says it was completed in December 1903. It remains the main rail link between the Barak Valley, parts of the northeast and the rest of India.
Riding it shows you the hills in a way a car cannot, with tunnels, gorges and ridges unfolding slowly. It also shows the district's present: gauge conversion, planned electrification and the ongoing work of keeping a line open through landslide country. For a traveller, it is both a transport option and a way of seeing the geography that shaped Haflong.
Highlights
What not to miss
- 01
Tunnels and ridges
The line threads through hills in a long series of tunnels and bridges.
- 02
A direct link
Trains calling at New Haflong connect the town with Guwahati and Silchar.
- 03
A line in transition
Gauge conversion is done and electrification was reported near completion in mid-2026.
Plan your visit
How to experience it
Choose a daylight train and a window seat, and decide which stretch you want. New Haflong station, code NHLG, sits on the Lumding-Badarpur hill section, and trains calling there link Haflong with Guwahati, Silchar and further afield. Ride one stretch, perhaps towards Maibang or Lumding, and return by road or the next suitable train.
The line passes through tunnels, over bridges and along ridges, so keep a camera ready but accept that the light flips quickly between bright and dark. Carry water and snacks, since onboard catering on hill passenger trains can be limited.
Plan for slack. The section is a single line through steep country, and landslides and heavy rain have interrupted it in past years. Have a flexible return plan, and check the running status the same morning. In 2026, NFR reported that electrification works were nearing completion on the section, so services may be changing.
Plan with confidence
Small decisions that make the visit easier.
- Check the current timetable and running status on the day
- Ride in daylight for the scenery
- Carry water, snacks and a seat cushion
- Keep a flexible back-up plan in the monsoon
- Keep luggage light for hill-station platforms
Know before you go
Timing, access and comfort
- Area
- New Haflong station and the Lumding-Badarpur hill section
- Time needed
- A few hours to a full day depending on the stretch
- Best time
- Daylight services from November to March
- Walking level
- Easy
- Senior comfort
- Seats are the main comfort concern: carry cushions, snacks and water, and book the best class you can. Platforms at hill stations can be uneven and the line runs through many tunnels, so keep luggage manageable and allow extra time.
- Tickets and access
- Book through Indian Railways; fares and timetables are not listed here. Services have changed since the line was converted to broad gauge, so check the current train list and running status before you commit.
Best for
Plan it with
Plan the practical part
Hotels near Lumding-Badarpur hill railway
Staying close keeps journeys short — useful for early starts and for anyone who tires quickly.
Affiliate link — we may earn a commission at no extra cost to you. Prices are live on the partner site.
Travelling with parents?
Seats are the main comfort concern: carry cushions, snacks and water, and book the best class you can. Platforms at hill stations can be uneven and the line runs through many tunnels, so keep luggage manageable and allow extra time.
Raahzo can arrange an arrival or day companion who handles tickets, queues and pacing, and keeps the family updated.
See concierge supportFAQs
What is the station code for Haflong?
New Haflong is NHLG, on the Northeast Frontier Railway's Lumding division.
Is the line scenic?
Yes, it runs through tunnels, bridges and hills, but delays and disruptions occur, especially in the rains.
Is the line electrified?
In June 2026 NFR reported work was nearing completion, with electric operation expected after trials. Check current status.
Sources and further reading
- Wikipedia: New Haflong railway station
- EastMojo: NFR electric operations in Dima Hasao hills
- Open: A Hilly Odyssey
Timings, fees and access rules change. Recheck with the official source before you travel.